After all the installation works have been completed, the period of check and start up works is started: All loops and circuits are subjected to tests.
Tests are usually carried out through the control system: setting of parameters, automatic control, testing of system in various operation modes.
Special attention must be devoted to loops of chemical and physical measurements, mostly supported by special experts.
The training of operational personnel is a part of this activity.